|
|
Photos of the QE2 Visit to the River Tyne in September 2007.QE2 Approaching the River Tyne - second attempt. This was the second of three attempts the QE2 made before finally entering the River Tyne at the fourth attempt. The photos on this page show the ship passing Tynemouth Pier from the north before turning away in a full circle to make ready for another approach. The photos may take a while to load depending on your connection speed.
| |||||
|